ENGINEERING WORKFLOW

From an operating case to a controlled release.

A model code is only the start of the engineering record. The workflow below defines what must happen before any public reference configuration becomes purchasable, installable, or operable equipment.

01

Define

Record fluid, cases, interfaces, project specifications, hazards, utilities, and acceptance criteria.

02

Select

Develop the thermodynamic or valve-function basis, preliminary configuration, materials route, and operating envelope.

03

Verify

Complete mechanical, materials, controls, integration, maintainability, and risk reviews.

04

Validate

Agree inspection, test, performance, functional, dimensional, traceability, and document acceptance.

05

Release

Issue approved datasheets, drawings, certificates, manuals, and the final manufacturing record index.