APPLICATION ENGINEERING

The process defines the review.

These are intended study contexts, not references to completed Axoventra installations. Each application becomes valid only when the fluid, operating envelope, interfaces, hazards, standards, and acceptance criteria are documented.

01

Air separation

Expansion and refrigeration studies begin with gas composition, phase condition, flow cases, cold-box interfaces, and availability targets.

02

Natural gas processing

NGL recovery and pressure-letdown studies require an operating map, contaminants review, controls, and package integration.

03

LNG and cryogenic systems

Low-temperature duty requires explicit minimum design temperature, compatibility, cleanliness, insulation, purge, and thermal movement review.

04

Hydrogen and helium systems

Containment, permeation, cleanliness, embrittlement, detection, and test acceptance must be defined for the specific service.

05

Refining and petrochemical

Valve selection requires line class, function, corrosion and erosion review, emissions, fire testing, actuation, and inspection scope.

06

Power and energy recovery

Efficiency, transients, vibration, control integration, maintainability, and acceptance testing govern the equipment study.